Homepage Favorite Chinese
 
 
·
more
  Details Information
Current Position: Home >>Details Information
Welder operation caution
Double-click the scroll Author:leslie Published:2010/2/3 16:21:56 readed:4798Views 【Fonts:big middle small

Welder operation caution
8.1 On rail in, need to be especially careful, prevent rail welding the impact.
8.2 In each completed weld, the operator must advertent between actual water chillers, such as water chillers, more than 30 degrees Celsius when welding, close to stop in the water pump, below 25 degrees, allowing start welding.
8.3 Every head back after welding machine, should go in advance, prevent 3mm welding process.
8.4 Strictly in energized to operate the transformer.
8.5 Welding slag shall timely liquidation, prevent for welding slag and cause a short circuit.
8.6 Every time welding system should be no more than 20 hours.
 
 
 

 相关评论

暂无评论

 发表评论
 呢称:
 评论内容:

Print || close
友情链接

四川西南交大工程技术有限公司
联系人:谭经理 13018283886 段经理 18081099982 电话:028-87619619 
网址:www.trackwelding.com 邮箱:trackwelding@163.com  

QQ:294108383  QQ:309657989   地址:彭州市丽春镇航空动力产业园A地块2号厂房
蜀ICP备2021023444号-1

友情链接:活动房